Jobs2Careers logoHome

Construction Scheduler

Buffalo,NY

295 Construction Scheduler jobs in Buffalo,NY

Easy Apply

Construction Sales Representative

Erie Home

Buffalo, NY 14225

$125,000-$250,000/yr
OnsiteHealth InsuranceRetirement Benefit

  • Valid driver's license, reliable transportation with auto insurance, and the ability to travel to and from in-home appointments.
SmartExplore AI is experimental.
View now
Apply Directly

People Operations Representative

FedEx Logistics

Tonawanda, NY 14150

$5,196.10-$8,244.52/mo
Hybrid~ 20 minEducation AssistanceHealth InsuranceRetirement Benefit

  • Bachelor's degree/equivalent in human resources, business or other related discipline
  • Three (3) years professional experience as a generalist including experience with recruitment/employment practices, employee relations, eeo/aap administration, management development and leave of absence administration required
  • Working knowledge of applicable federal, state, and local laws, and federal regulations required
  • Some travel required
SmartExplore AI is experimental.
View now
Easy Apply

2nd Shift Mold Setter

Adecco

Buffalo, NY 14221

$30-$32/hr
OnsiteEducation AssistanceHealth InsurancePaid Time OffRetirement Benefit

  • Associates degree preferred.
  • Two years' related experience and/or training; or equivalent combination of education and experience.
  • This is a 3rd shift position with Training on 1st shift (7am-3pm) the first 3-4 weeks of hire to get acclimated to business/work tasks.
  • Mold Setter – 2nd Shift
  • Positions assembled molds on press bed of molding machine bolts to assemble and align die with matrix.
  • Installs die on machine using clamps, bolts, and hand tools. Adjusts stroke of ram.
  • Connects steam, oil or waterlines to molding machines.
  • Sets machine controls to ensure process control during manufacturing cycle according to procedures.
  • Places necessary mixtures of resins, dry as required, into hopper.
  • Starts up sample mold runs and examine samples to ensure all requirements are in place.
  • Verifies critical dimensions and submits the product to Quality Assurance for approval.
  • Responsible for general housekeeping of work area.
  • Sets up and repairs machinery and equipment in accordance with diagrams, sketches, and operation manuals and manufacturers specifications.
  • Mounts, aligns and bolts fixtures, dies and welding heads onto fabricating machines.
  • Performs startup and shutdown of equipment.
  • Adjusts and sets controls to assure proper machine operation and timing.
  • Performs preventative maintenance as scheduled.
  • Will occasionally load heavy materials to machine.
  • Other duties as assigned.
  • A medical examination to confirm an individual's ability to safely perform the essential functions of the position is a pre-employment requirement
  • The employee must occasionally lift and/or move up to 50 lbs using good posture and lifting techniques, if object is at an awkward angle or height, a 2 person lift or assist device should be used.
  • Specific vision abilities required by this job include close vision, distance vision, color vision, peripheral vision, depth perception, and ability to adjust focus.
  • An on-site gym
  • Tuition reimbursement program
  • Quarterly bonuses
  • Paid holidays and vacations
  • Health, Dental, and Vision insurance, 401K
  • Weekdays 3pm to 11pm; weekends and overtime may be required based on business needs.
  • Pay Details: $30.00 to $32.00 per hour
  • Shift differential - $0.25/hour
SmartExplore AI is experimental.
View now
New, Posted 9 hours ago
Easy Apply

Telephone Screener (Remote)

Hire Standard Staffing

Buffalo, NY

$120,000/yr
RemoteHealth Insurance

  • Must be a U.S. or Canadian citizen
SmartExplore AI is experimental.
View now
New, Posted 2 hours ago
Apply Directly

Paint Line Laborer

Dimar Manufacturing

Clarence, NY 14031

$18-$22/hr
New, Posted 1 day ago
Apply Directly

Tool and Die Maker

General Motors

Buffalo, NY 14276

Flexible Schedule
Easy Apply

Beverage Merchandiser -TJ Sheehan - Buffalo Route

TJ Sheehan Distributing

Buffalo, NY 14202

$37,440-$41,660/yr
OnsiteEducation AssistanceHealth InsurancePaid Time OffRetirement Benefit

  • High School Diploma Required
  • Previous experience working in retail
  • Ability to fulfill physical demands of the job
  • This position will cover the Erie and Niagara County territories.
  • Must live in the Buffalo area!
  • Valid driver's license with active auto insurance
  • Ability and willingness to work independently
SmartExplore AI is experimental.
View now
New, Posted 8 hours ago
iHire

Cabinetmaker

Geiger

Buffalo, NY 14201

New, Posted 1 day ago
iHire

Landscape Foreman

O'Donnell Landscapes

Buffalo, NY 14224

$55,000-$75,000/yr
iHire

Laborer

CVM Electric

Buffalo, NY 14201

  1. Buffalo,NY Jobs
  2. →
  3. Construction Scheduler Jobs

What companies are hiring Construction Scheduler jobs in Buffalo,NY?

  1. Erie Home
  2. FedEx Logistics
  3. Adecco
  4. Hire Standard Staffing
  5. Dimar Manufacturing
  6. General Motors
  7. TJ Sheehan Distributing
  8. Geiger
  9. O'Donnell Landscapes
  10. CVM Electric

What is the hourly salary range for Construction Scheduler jobs in Buffalo,NY?

The hourly salary range is $18 - $32.

Recent Searches

    Browse Jobs in Top Cities

    Browse Jobs by State

    Browse Jobs by Title

    Free Resume Builder

    Post a Job

    About

    Advice

    Contact

    © 2026 Jobs2Careers. All rights reserved.

    Privacy Policy

    Terms of Use

    Your Privacy ChoicesCalifornia Consumer Privacy Act (CCPA) Opt-Out Icon

    Logos provided by Logo.dev

    Jobs2Careers Powered by Talroo