Jobs2Careers logoHome

Data Center Construction

Dallas,TX

1930 Data Center Construction jobs in Dallas,TX

New, Posted 12 hours ago
Apply Directly

Warehouse Order Picker - $19.50/hr | 4-Day Workweek

E. A. Sween Company

Lewisville, TX

$19.50/hr
~ 33 min OnsiteEducation AssistanceHealth InsurancePaid Time OffRetirement Benefit

  • Must be at least 18 years old
  • Ability to read and speak basic English
  • Basic math skills
  • Ability to work accurately in a fast-paced environment
  • Ability to meet productivity expectations
  • Dependable attendance and reliable transportation
  • No warehouse experience required
  • Must be able to lift up to 75 lbs. frequently
  • Must be able to push/pull up to 250 lbs. frequently
  • Stand and walk for extended periods
  • Frequent bending, twisting, reaching, kneeling, and squatting
  • Work in refrigerated and dry areas ranging from approximately 35°F to 75°F
  • Overtime available
SmartExplore AI is experimental.
View now
Apply Directly

Entry Level Management

Ramos Agencies

Dallas, TX

$75,000-$95,000/yr
Onsite

  • Willing to undergo a background check
  • Driver License
SmartExplore AI is experimental.
View now
Apply Directly

Food Preparer $21.00 Weekly pay

gategroup

Dallas, TX

Onsite

  • High School Diploma or GED is preferred
  • Up to one-year experience preferred
  • Must be able to read and write to complete required forms
  • Communicate effectively with supervisors and co-workers
  • Work assigned schedule which may vary and could include weekends and holidays
  • Works overtime when required
  • Arrives to work on-time
  • Complies with company policies
  • Completes paperwork and related administrative duties
  • Handles pork, poultry, meat and fish products
  • Will be exposed to extreme temperature changes and noise
  • May work in a cold room of 40 degrees or less for extended periods of time
  • Must be able to lift, push, pull, and move product, equipment and supplies up to fifty (50) pounds frequently during shift
  • Regularly stands, bends, lifts, and moves intermittently during shifts of 8+ hours
SmartExplore AI is experimental.
View now
Apply Directly

Entry Level Programming Opportunity

Year Up United

Dallas, TX

$525/wk
Onsite

  • A high school graduate or GED recipient
  • Eligible to work in the U. S.
  • Highly motivated to learn technical and professional skills
  • Have not obtained a Bachelor? s degree
  • You may be required to answer additional screening questions when applying
SmartExplore AI is experimental.
View now
New, Posted 9 hours ago
Apply Directly

Infra Delivery Technician

Amazon Data Services

Wilmer, TX

Flexible Schedule
Apply Directly

Data Center/Chiller Technician

Trane Technologies

Fort Worth, TX

~ 44 min OnsiteUrgently HiringEducation AssistanceHealth InsurancePaid Time OffRetirement Benefit

  • A High School Diploma or GED equivalent is required.
  • 5+ years of experience in HVAC providing expertise in the systems level knowledge.
  • Proven experience performing start‑up of air‑cooled and water‑cooled chillers, including system preparation, commissioning procedures, operational verification, and post‑start performance checks and repairs.
  • Proficient utilization of software to connect and check chiller operation.
  • EPA Certification required.
  • Must possess a valid driver's license for a minimum of 12 months, with no major or frequent traffic violations including, but not limited to: DUI, Hit & Run, License Suspension, Reckless / Careless Driving or multiple smaller infractions or preventable collisions in the previous 3 years.
SmartExplore AI is experimental.
View now
Apply Directly

Data Labeling Specialist: Remote Contract

Workada

Irving, TX

Remote
Apply Directly

Apprentice Pipefitter

Upchurch

Arlington, TX

~ 36 min OnsiteHealth InsurancePaid Time Off

  • Minimum 2-3 years of construction, mechanical, industrial, or pipefitting-related experience preferred.
  • Basic knowledge of pipefitting, plumbing, HVAC, or mechanical construction is preferred.
  • Ability to read and interpret basic blueprints, drawings, and specifications is a plus.
  • OSHA 10 certification preferred but not required.
SmartExplore AI is experimental.
View now
Apply Directly

Entry Level Management

The Busby Agencies

Bedford, TX

$1,500-$2,000/wk
~ 32 min Onsite

  • High school diploma or GED
  • No experience necessary
SmartExplore AI is experimental.
View now
New, Posted just now
Apply Directly

Work From Home Benefits Specialist - Full Training

Globe Life Virtual Sales

Dallas, TX

RemoteUrgently HiringFlexible Schedule

  • No Experience Required
  • No prior experience is required
  • Reliable internet and a quiet workspace
SmartExplore AI is experimental.
View now
  1. Dallas,TX Jobs
  2. →
  3. Data Center Construction Jobs

What companies are hiring Data Center Construction jobs in Dallas,TX?

  1. E. A. Sween Company
  2. Ramos Agencies
  3. gategroup
  4. Year Up United
  5. Amazon Data Services
  6. Trane Technologies
  7. Workada
  8. Upchurch
  9. The Busby Agencies
  10. Globe Life Virtual Sales

What is the hourly salary range for Data Center Construction jobs in Dallas,TX?

The hourly salary range is $19.5 - $19.5.

Recent Searches

    Browse Jobs
    • Jobs in Top Cities
    • Jobs by State
    • Jobs by Title
    • Jobs by Category
    Tools
    • Free Resume Builder
    • Jobs2Careers+ Extension
    Company
    • Post a Job
    • About
    • Advice
    • Contact
    Jobs2Careers Powered by Talroo© 2026 Jobs2Careers
    Logos provided by Logo.dev
    © 2026 Jobs2Careers
    Privacy PolicyTerms of UseYour Privacy ChoicesCalifornia Consumer Privacy Act (CCPA) Opt-Out Icon
    Jobs2Careers Powered by Talroo