Jobs2Careers logoHome

Qc Associate Data Center Construction

Houston,TX

452 Qc Associate Data Center Construction jobs in Houston,TX

Apply Directly

Quality Inspector

Emerson

Pasadena, TX 77505

~ 33 min OnsiteEducation AssistanceHealth InsurancePaid Time OffRetirement Benefit

  • High School Diploma or equivalency (G.E.D.)
  • 2+ years of experience in a manufacturing role.
  • Strong mechanical aptitude is a must.
  • Ability to perform in a fast-paced environment while maintaining a professional and effective approach in high-stress situations.
  • Proficiency in reading and interpreting engineering drawings, blueprints, and other technical documents.
  • Experience with precision measuring tools and instruments such as micrometers, calipers, and gauges.
  • Basic to intermediate proficiency with ERP systems (Oracle preferred) and Microsoft Excel for data entry, tracking, and reporting.
SmartExplore AI is experimental.
View now
New, Posted 15 hours ago
ResumeLibrary

Part Time/Full Time Remote Data Entry Specialist

Apex Focus Group

Houston, TX 77246

$750/wk
Remote
Easy Apply

Assembly Specialist

Adecco

Houston, TX 77084

$34.48/hr
OnsiteHealth InsurancePaid Time OffRetirement Benefit

  • High School Diploma/GED
  • 5+ years of relevant experience in Assembly of Rotating Equipment in a manufacturing environment
  • Skilled in interpreting technical assembly instructions, building methods, and sequencing of core compressor internals and auxiliaries
  • Ability to inspect, repair, replace, install, and maintain mechanical components and assemblies for gas turbines and compressor packages
  • Ability to use micrometers, indicators, hand tools, air grinders, and overhead lifting devices
SmartExplore AI is experimental.
View now
New, Posted 1 day ago
ResumeLibrary

Quality Control Manager - Prairie Band Construction (Hiring Immediately)

Prairie Band, LLC

Houston, TX 77002

Apply Directly

Healthcare Customer Service - Remote, Mon-Fri 9-5 ET

NexRep

Houston, TX

$15/hr
Remote

  • Status: Remote, W-9 (Independent Contractor)
  • To be a Customer Service Representative, you will need a Windows PC.
  • Chromebooks and Macs cannot be used.
  • You will need a computer and equipment meeting the following specifications, at a minimum:
  • Access to high-speed, hardwired internet (no Wi-Fi or Satellite, please)
  • A PC with Windows 11 (Macs and Chromebooks are not supported at this time)
  • 16GB of RAM
  • 250GB of hard drive space
  • An Intel i3 9th Gen Processor or newer
  • Up-to-date antivirus software
  • Dual monitors, each capable of displaying at least 1024 x 768 pixels
  • A USB noise-cancelling headset
  • A smartphone for multi-factor authentication
  • A webcam for your Certification experience
  • NexRep contracts with people in 31 states.
  • You are eligible to contract with NexRep if you reside in one of these states: AL, AK, DE, FL, GA, ID, IN, IA, KS, KY, LA, MI, MS, MT, NE, NV, NH, NM, NC, ND, OH, OK, PA, SC, SD, TN, TX, UT, VA, WV, or WY.
  • Please note that our third-party client requires that independent contractors service at least 20 hours per week.
SmartExplore AI is experimental.
View now
ZipRecruiter

Research Analyst

Greater Houston Partnership

Houston, TX 77010

New, Posted 15 hours ago
Apply Directly

Data Labeling Specialist: Remote Contract

Workada

Pasadena, TX 77502

Remote
jobsinlogistics.com

Production Line Support (coating)

The Timken Company

Houston, TX 77084

Onsite

  • Produce a quality coating and coated product by following written and verbal instructions.
  • Accurately measure and record all pertinent data.
  • Document discrepancies in materials and/or process.
  • Self-inspect work produced as well as work produced by others.
  • Monitor inventory of raw materials, tools, and supplies.
  • Follow safety guidelines include wearing required PPE.
  • Must understand and comply with all safety rules, ISO 9001, and company policies.
  • Basic math and geometry knowledge.
  • Basic measurement and print reading skills.
  • High attention to detail.
SmartExplore AI is experimental.
View now
Apply Directly

Medical Telephone Screener - WFH - Choose your own Schedule

Teladoc

Houston, TX

$12.50/hr
RemoteFlexible ScheduleHealth Insurance

  • Access to high-speed, hardwired internet (no Wi-Fi or Satellite, please)
  • A PC with Windows 11 (Macs and Chromebooks are not supported at this time)
  • A processor that meets the minimum requirements:_Intel Core i3 9 th Gen or newer, AMD Ryzen 3 or newer, or equivalent_
  • At least 8GB of useable RAM
  • At least 200MB of free hard drive space
  • Up-to-date antivirus software
  • Access to a smartphone or device for multi-factor authentication
  • Dual monitors, each capable of displaying at least 1024 x 768 pixels
  • A USB noise-cancelling headset
  • A webcam for your certification experience
  • Quiet, dedicated, paperless and cell phone free workspace, along with:
  • NexRep contracts with people in 31 states. You are eligible to contract with NexRep if you reside in one of these states: AL, AK, DE, FL, GA, ID, IN, IA, KS, KY, LA, MI, MS, MT, NE, NV, NH, NM, NC, ND, OH, OK, PA, SC, SD, TN, TX, UT, VA, WV, or WY. We do not currently contract with anyone outside of the US.
SmartExplore AI is experimental.
View now
ResumeLibrary

To-Go

Texas Roadhouse

Houston, TX 77001

Flexible Schedule
Apply Directly

Remote Customer Service

Serur Organization

Houston, TX

Remote

  • Customer Service Rep Work From Home
  • Benefits Representative
  • Remote work
SmartExplore AI is experimental.
View now
  1. Houston,TX Jobs
  2. →
  3. Qc Associate Data Center Construction Jobs

What companies are hiring Qc Associate Data Center Construction jobs in Houston,TX?

  1. Emerson
  2. Apex Focus Group
  3. Adecco
  4. Prairie Band, LLC
  5. NexRep
  6. Greater Houston Partnership
  7. Workada
  8. The Timken Company
  9. Teladoc
  10. Texas Roadhouse
  11. Serur Organization

What is the hourly salary range for Qc Associate Data Center Construction jobs in Houston,TX?

The hourly salary range is $12.5 - $34.48.

Recent Searches

    Browse Jobs in Top Cities

    Browse Jobs by State

    Browse Jobs by Title

    Free Resume Builder

    Post a Job

    About

    Advice

    Contact

    © 2026 Jobs2Careers. All rights reserved.

    Privacy Policy

    Terms of Use

    Your Privacy ChoicesCalifornia Consumer Privacy Act (CCPA) Opt-Out Icon

    Logos provided by Logo.dev

    Jobs2Careers Powered by Talroo